Home < Business Area < Production Engineering
 
 
   
 
   
 
 
  S.E (Simultaneous Engineering)
From the initial design stage, SE work is started, and its target is to
reduce part development period, to secure the part quality in mass production, to minimize the investment cost, to optimize the productivity
by reviewing and improving an initial process plan, design review,
assembly workability based on Digital Pre-assembly analysis, part accessibility, and the initial part quality control.
  Process Planning
V-ENS provides the best condition for production operation through
reviewing of current production status, layout and M&E suitability
with the optimized Operation Standard Time, Unit Working Time and
process plan for optimized parts supply and assembly process flow
for new plant as well as mixed production plant.
  Design Review
V-ENS implements design review and improvement activities to meet the initial Part Design Concept with Production operation through checking suitability of M&E and parts using M&E, work efficiency and Pool Proof considered part assembly suitability and quality.
  Digital Pre Assembly
V-ENS implements 3D virtual assembly simulation to check the suitability of part assembly and improves work efficiency through part quality improvement, reducing end item, M&E optimization, reducing Man-Hour and part communization for various vehicle production.
  Layout
V-ENS implements the reducing investment by minimizing modification of current line condition through detail review of the installed M&E each station and makes Layout considered the minimum fatigue of workers by repeat work, reducing working time and improving logistic considered M&E location.